Project Management For Your Project

Your building project is in the works. You’ve decided that it would be best to have a project manager handling all the details. Here is a quick look at what you should expect this person to bring to your home project.

Managing Your Project

The project manager will be responsible for all aspects of your construction project. This takes all of the work off of your shoulders so that you can relax and know that someone skilled in this type of work will ensure that your project is done correctly and is completed on time and within your budget. The project manager will be the person who works on the following details:

  • Create a cost estimate for the project
  • Formulate the budget for the project
  • Draw up a construction schedule
  • Determine the guidelines for project execution
  • Be the point person for all project stakeholders
  • Review contract details with all construction teams and workers
  • Supervise the project to track construction and enforce regulations
  • Conduct risk management assessments
The importance of a project manager

The project manager will trace every step of your construction job from start to finish including the creation of the building plans, discussing the project with a draftsman and home designer, and coordinating what gets done and when throughout the entire lifespan of the project.

 

Phases of Construction Project Management

There are six primary phases to construction project management. Here is a breakdown of what they are:

Phase 1

The Concept

This is where the idea for your new construction comes from. It can be as simple as the thought of “design my home” to Brisbane house plans that are specific to the needs of you and your family. The concept phase includes more than just the project design. It covers location research for the build, the establishment of a construction timeline, and the first set of standards to follow.

 Phase 2

Pre-Build

This is the step of the project that involves various preparations necessary before work on bespoke homes can begin. It can include site inspections, testing of site soil, the creation of a project schedule, and organising the purchase of all materials required for the project. Workers get hired, the project team is put together, and everything should be ready to start construction.

The pe-build and starting a build

 Phase 3

Project Start

This phase is where hammers start to fly and the house or renovation starts to take shape. As much as preparation assists in getting to this part of the process, there will be snags and hurdles to navigate. It’s just part of any construction project that requires several different tradespeople coming and going. The project manager will iron out any kinks as they occur.

Phase 4

Testing Period

Once the construction phase is complete, the project shifts into this phase. This is where all systems that have become part of the project get tested. It is essential to go through every system one by one and conduct thorough tests on each and document the results. If something fails, this is the time in the process to get it fixed and operational.

 

Phase 5

Move-In/Warranty Period

As soon as the new home or renovation is ready for occupancy, the warranty period begins. Two main warranties take effect at this point. They are the contractual warranty, which covers the integrity of systems and structural concerns, and the implied warranty. This one is a legal obligation related to the building. If issues arise, the warranties correct them and protect all involved.

Move-In/Warranty Period

Phase 6

Final Wrap-Up

This marks the end of the project. The project manager still has work to do, but for all intents and purposes, the role of the project manager ends shortly after the final obligations are met. They may include a post-construction review, documenting final observations, reports on various aspects of the project, and general paperwork to complete the project.

 

Turn To MiCo Design and Drafting For Project Management Advice

Have a building project coming up and not sure how to get it off the ground? The draftsman at MiCo Design and Drafting can help you with everything from design plans to advice on how to best approach your project. It may mean taking on a project manager. To find out more, contact MiCo Design and Drafting today.

 

Conclusion

Not every building job requires a project manager. However, the bigger and more complex the project is, the more likely a project manager will be required. This role is important in ensuring that your project gets done correctly, on time, and budget. It’s a big job that is best left for a professional to take on. Once your project is complete, you will see the value of involving a project manager.

 