Building plans can quickly get out of hand if you do not have a construction budget to keep costs under control. But how do you know what should be included when you are either building a home or looking at a house extension plan? Well, if you follow the 70/30 rule for hard and soft costs, you can create a budget for a building project you can afford.
Components of Your Budget
How that budget looks for you will be specific to your design plans, but every building budget should have the following components in it:
Property
If your project is for new home construction, the bulk of your hard costs will be spent here. Keep in mind that depending on where the property is and what amenities are nearby, the cost will vary considerably from one part of town to another and it will differ from community to community.
Professional Fees/Services
From design plans and building permits to surveying, engineering, and real estate fees, numerous professional consulting and service fees will have to be accounted for. The majority of these will be required before construction can begin and some will not be required until the project is complete. You still have to budget for them anyway.
Materials
There are several different types of material costs. They will include site preparation, landscaping materials, and the items required for the actual building structure. These would include framing material, insulation, windows, flooring, drywall, roofing, paint and so on.
Labour
This is probably one of the most difficult of the construction costs to estimate. That is because the length of time to complete the project is virtually impossible to predict until the project is underway. A firm budget will also keep contractors on track with your project. Labour costs will mostly likely be a figure attached to an hourly rate for workers and equipment.
Equipment/Tools
Every construction project will require various tools and pieces of equipment. Some are hard costs and others are soft. When figuring out the equipment and tool costs, you should also factor in fuel, operating, and delivery fees on top of any rental fees required.


Project Management
Project management staff must be highly skilled and organised. They are the people who make sure all parts of your building project are done and keep the project on track. They may provide security, take care of safety concerns, and fill many different types of support roles.
Insurance/Bonds
Regardless of the size of your building project, you should have liability insurance in place. The type of construction project will dictate whether or not you will need to include a deposit or bid bond. Some projects require performance bonds. Be sure to check first to see if you need them.
Utilities/Taxes
Depending on the type of construction project you are undertaking, water, sewer, gas, and electrical services may need to be installed. Each has an independent permit and hook-up fees. There may also be certain taxes that your project will incur with local or regional governments.
Contingency
This is essentially your backup, your extra budget amount to handle those things that may crop up when you least expect them. A simple guideline to use for a contingency fund is to set aside a portion of your total budget. The figure can be between 3 and 10 percent and it should be enough to cover things like changes in the overall project design or scope, upgrades to materials used, accidents, equipment breakdowns, and any other cost unknown when the initial budget was created.
How A Home Designer Can Help With Your Project Budget
Trust the home designers at MiCo Design and Drafting to help you with your construction budget. Whether you are adding to your home or building a new one, the draftsman at MiCo Design and Drafting will discuss design options to fit your budget and save you money with eco-friendly design plans. To find out more, contact them today.
In Conclusion
One way to keep costs under control and a project on track is with a construction budget. There are many considerations to factor into one, but without a budget, you risk spending far more than necessary on your building project. There are several ways to create a construction budget but the most common practice is to use the 70/30 rule that splits hard (the 70 percent part) with soft costs (the remaining budget).